2006: Upgrade to 50 MW
The total output of the wind turbines at the test station is close to exceeding 15 MW.
The 10 kV grid is being upgraded to a maximum capacity of 50 MW for the entire test station.
The total output of the wind turbines at the test station is close to exceeding 15 MW.
The 10 kV grid is being upgraded to a maximum capacity of 50 MW for the entire test station.